This document details how to perform a partial and complete power cycle.
- Stop all hardware in MagIC Net
- Close MagIC Net
- Power off IC – the switch is above the power cord.
- Do not pull power cable
- Do not turn off power strip
- Wait at least 1 min
- Optional for a complete power cycle
- Power off computer – not a restart
- Wait at least 1 min
- Power on computer
- Wait at least 2 min
- Power on IC
- Open MagIC Net
- Click on configuration tab
- All devices should be ok in about 2 min
- All devices should be ok in about 2 min
Steps to check instruments functionality
- Click on Workplace and Start HW.
- Verify that pressure is good – as expected by 5 mins
- If pressure is close to 0, then purge pump.
- Anions IC should be equilibrated for 30mins to ensure that all three MSM chambers of the MSM rotor are functioning.
- After 30mins, then start sample table. Please note that if the MSM was just stepped, then wait 30sec before clicking Start on sample table.