This document details how to perform a partial and complete power cycle.
- Stop all hardware in MagIC Net.
- Close MagIC Net.
- Power off IC - the power switch is above the power cord.
- Do not pull power cable.
- Do not turn off power strip.
- Wait at least 1 minute.
- Optional for a complete power cycle.
- Power off computer - do not restart.
- Wait at least 1 minute.
- Power on computer.
- Wait at least 2 minutes.
- Power on IC.
- Open MagIC Net.
- Click Configuration tab.
- All devices should be OK in approximately 2 minutes.
To check instrument functionality:
- Click on Workplace > Start HW.
- Verify pressure is good – as expected by 5 minutes.
- If pressure is close to 0, purge pump.
- Anion IC should be equilibrated for at least 30 minutes to ensure that all three chambers of the MSM rotor are functioning.
- After 30 minutes, start sample table. Please note that if the MSM has just stepped, wait 30 seconds before clicking Start on sample table.